Two construction crews work on the Mike O’Callaghan-Pat Tillman Memorial Bridge
On the Nevada (left) side of the picture, above Pier 5, Olsen Beal crews continue removal of the temporary pylons using a Liebherr LTM1400-7.1 crane. In the center of the picture – the south highline crane carries a precast Spandrel column segment out for erection at Pier 10. Photo: Barcroft/Fame Pictures